WIKA Industrial Area (20 ha), consists Of various industrial and production facilities such as Electric Vehicle Assembly Line, Pre-Cast Concrete Production, and Plastics Manufacturing & Painting. We assess 18 buildings in total, then conducted FRA and Fire Engineering Consulting Reports which embodies the Water-based Fire Protection System Concept Design, Drawings, and BQ Estimation.